Your practice is busiest on the same day the PSTN switches off. Here is a timetable that finishes the move before the Self Assessment rush.
Compare Business Phone Systems






If your practice is still running on an old landline setup, the sensible time to change it is before the Self Assessment rush, not during it. Move your phones by mid-November and you will go into January with a system your team has already learned; leave it later and you risk a changeover in the busiest weeks of your year, just as the PSTN switch-off lands on 31 January 2027.
That coincidence is the whole story. The online Self Assessment deadline and the final PSTN switch-off date fall on the same day, and an accountant's phones are never under more strain than in the fortnight before it. This guide sets out a working timetable, what to check on your existing lines, and which call-handling features earn their keep when every client rings at once.
A phone migration is not hard, but it is not instant either. Numbers have to be ported, handsets configured, call flows tested and staff shown where everything lives. Doing that while partners are chasing late returns means the changeover competes with billable work, and any teething problem lands on clients at their most anxious.
There is a second pressure. Stop-sell on new analogue lines is already in force, and the national switch-off completes on 31 January 2027. Waiting for a deadline that cannot move is a poor plan when you also cannot afford downtime. If you want the wider picture first, our guide to the big switch-off in 2027 covers who is affected.
Lead times vary with the number of lines, how many sites you run and whether you are porting numbers, so treat the table below as a planning frame and ask for current lead times when you request a quote.
| When | What to do | Why it matters |
|---|---|---|
| Now to early November | Audit every line, including fax, alarm, door entry and card machine. Run the PSTN switch-off checker. | Hidden dependencies are what derail a late migration. |
| Early to mid November | Choose the system, confirm users and handsets, and start number porting. | Porting takes time and is the step you least want to rush. See how long porting takes. |
| Mid to late November | Install, test and train. Run old and new in parallel if you can. | Staff get weeks, not days, to settle in. |
| December | Fine-tune queues, opening-hours greetings and voicemail routing. | You enter January with a system that already works. |
| January | Change nothing. Monitor and adjust call flows only. | Protect the deadline fortnight. |
Most practices find the phones themselves are the easy part. The surprises are the devices quietly sharing those lines: the card machine at reception, the intruder alarm, a lift line in a shared building, or a fax-to-email service nobody has touched in years. We cover these in detail in alarms, lift lines and card machines at the switch-off, and the 90-day countdown checklist turns it into a to-do list.
When a hundred clients ring within the same hour, the aim is not to answer faster than humanly possible; it is to make waiting tolerable and make sure nobody falls through the gaps. Three features do most of the work.
The same principles apply to any seasonal peak, which we explore in managing high call volumes in peak trading. If your firm records calls, for example where you give regulated financial advice, check recording and retention against your own obligations; the finance and accountancy page outlines the options, and our Gamma Horizon page lists the packages and prices.
Practices of every size tend to have the same pattern: a small team, a handful of lines, one or two partners who look after IT on the side. A provider that can survey the site, port the numbers and be on the end of a phone in January is worth more than a slightly cheaper plan from a distance. T2K supports businesses across the UK from its Bournemouth head office.
Get your practice phones sorted before January
Tell us about your lines and we will map a changeover that finishes before the Self Assessment rush.
Request a quoteThe final date is 31 January 2027, and stop-sell on new analogue lines is already in force.
Not if you start now. A small practice can usually move in weeks, but number porting and any site work set the pace, so ask for current lead times.
Done well, no. Your numbers stay the same, and the new system can give callers a clearer queue and call-back experience than before.
In most cases yes, through porting. Check this early, as it is the longest step.

Lee is Managing Director of T2K Voice & Data and has been with the company for 29 years. He started his career at T2K Voice & Data as a telecoms engineer, later became Sales Director, and was then appointed Managing Director. Having installed, configured and supported business phone systems himself, he gives practical, impartial advice on VoIP, cloud telephony, hosted phone systems and unified communications. As one of T2K Voice & Data’s main authors, Lee writes clear, jargon-free guidance for businesses of all sizes, from small offices choosing their first cloud phone system to multi-site organisations planning a move away from ISDN and legacy lines.
Tell us your needs — we'll match you with the best system and price.
🔒 No spam. Your details are secure. We'll contact you within 24 hours.
Need help? Give us a call on 0808 202 3200
Rated 4.9